Case studies
Real results from real facilities.
How two electronics manufacturers and a clinical lab took routine transport off their teams with Model C2: the problem, the deployment, and the numbers.
-
Manufacturing · High-reliability electronics
Emerald Technologies expands material handling capacity with Model C2.
Two Model C2 carts return wave solder pallets and deliver SMT reels, so one material handler now supports five lines.
- 5SMT lines per material handler, up from two
- 500+miles traveled by two carts in the facility
- 2Model C2 carts, purchased October 2024
-
Life science · Clinical diagnostics
Life science lab reclaims 1,090 hours a year with Model C2.
Two Model C2 Large carts carry specimen racks from central sort to more than a dozen departments, around the clock.
- $39,600saved per year
- 38,300deliveries per year
- 1,490miles of walking per year
-
Manufacturing · Electronics
Electronics manufacturer saves $33,792 a year with Model C2.
A circuit board facility automated the trips between workstations and reached full ROI in 5.7 months.
- $33,792annual recurring savings
- 128 hrslabor saved per month
- 20%productivity gained
Want results like these?
Tell us what you move and where. We’ll show you how Model C2 fits, in a short demo.